Section 2.4 Motorized Operator Installation

The electrical contractor should have already installed the wire or a junction box to the installation of the shutter system. Double-check the Rolling Order Form to ensure that the power locations are correct. Always check with the local building codes to make certain that the wiring is correct.

1. Locate and drill the hole in the back of the shutter box for the power cord.

 2. Feed the wire through the back to the shutter box. 

3. Connect the wires to the motor “pig tail”. 

4. Fill the hole with caulk to maintain the integrity of the wall.

Click here to see a larger figure