| The electrical contractor should have already installed the
wire or a junction box to the installation of the shutter system.
Double-check the Rolling Order Form to ensure that the power locations are
correct. Always check with the local building codes to make certain that
the wiring is correct.
1. Locate and drill the hole in the back of the shutter box for
the power cord.
2. Feed the wire through the back to the shutter
box.
3. Connect the wires to the motor “pig tail”.
4. Fill the hole with caulk to maintain the integrity of the
wall. |